The combined one-time savings of the wasteWOIMA® plant during the project development and construction phases amount up to 7,000,000 €. The savings potential is naturally project-, site- and customer-specific and it is possible that not all savings are applicable to each individual project.
The savings are mainly a result of
- Existing plant design, supply chain and documentation
- Simpler, easier and faster work phases on site
- Smaller quality, quantity and time-based risks
The top 5 savings items are
- Construction, erection & installation work phases
Quantity-based risk contingency- Financing costs
- Boiler & turbine hall delivery
- Estimation risk contingency
Further development of WOIMAdesign and wasteWOIMA® plant concept are likely to improve savings in particular in
- Project development
- Construction, erection & installation work phases
- Commissioning & trial run work phases
- Localization
- Documentation
Follow the “Monetizing wasteWOIMA® Benefits” blog series to discover how our solution can save money for You.
Read more about us at www.woimacorporation.com
WOIMA Corporation is a Finnish supplier of best-in-class waste-to-value products, projects and services worldwide. We have developed solutions that enable us, and the customer, to transform and recycle virtually any waste stream into raw materials and energy. At WOIMA we combine Finnish engineering know-how in waste management with power generation design expertise. These solutions are used in Finland every day. They support the circular economy ideology and ensure that less than 1% of Finland’s waste ends up in landfills.
Our mission is to improve quality of life both locally and globally, as well as empower people to utilize waste as a commodity. Our decades of international project management experience ensure an on-time, in-budget and high-quality WOIMA solution delivery across the globe.
WOIMA SOCIAL MEDIA ACCOUNTS