Woima Corporation

Monetizing wasteWOIMA® Benefits – Time-based Risk Contingency Reduction

Uncertainty is one thing all projects have in common. Much of this is caused by the unknown circumstances of on-site work. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly.

Companies manage this uncertainty by including contingencies in their project budgets, such as

The workshop-quality modular structure of the wasteWOIMA® WtE plant de-risks the project by moving most of the work away from the site to a more controlled environment

This reduces the risk for delayed project work significantly and allows for the reduction of the time-based risk contingency due to

Combined, these WOIMAbenefits can save over 300,000€ in time-based contingency reserves.

Follow the “Monetizing wasteWOIMA® Benefits” blog series to discover how our solution can save money for You.

WASTE-TO-ENERGY SOLUTION

Read more about us at www.woimacorporation.com

WOIMA Corporation is a Finnish supplier of best-in-class waste-to-value products, projects and services worldwide. We have developed solutions that enable us, and the customer, to transform and recycle virtually any waste stream into raw materials and energy.  At WOIMA we combine Finnish engineering know-how in waste management with power generation design expertise. These solutions are used in Finland every day. They support the circular economy ideology and ensure that less than 1% of Finland’s waste ends up in landfills.

Our mission is to improve quality of life both locally and globally, as well as empower people to utilize waste as a commodity. Our decades of international project management experience ensure an on-time, in-budget and high-quality WOIMA solution delivery across the globe.

WOIMA SOCIAL MEDIA ACCOUNTS


 

 

 

 

 

 

Exit mobile version