Typically, RFQs require 8,000h of annual plant availability. The wasteWOIMA® design is based on best available technologies (BAT) combined with optimized material and equipment selection to ensure at least 8,200h annual availability.

Better plant availability is achieved through

  • Longer MTBF
  • Less maintenance breaks
  • Shorter maintenance breaks
  • Less unplanned stoppages
  • Fast recovery from operational deviations

The wasteWOIMA® plant design is largely based on lessons learned during the Westenergy WtE plant project in Vaasa, Finland

  • Westenergy reached 98.8% (8,655h) availability in 2021
  • Westenergy reached 95,6% (8,373h) average availability between 2018 and 2022

Combined, these WOIMAbenefits can generate close to 4,000,000€ of additional revenue during the WtE plant lifespan.

 

Follow the “Monetizing wasteWOIMA® Benefits” blog series to discover how our solution can save money for You.

 

WASTE-TO-ENERGY SOLUTION

WOIMA Corporation small logo web

Read more about us at www.woimacorporation.com

WOIMA Corporation is a Finnish supplier of best-in-class waste-to-value products, projects and services worldwide. We have developed solutions that enable us, and the customer, to transform and recycle virtually any waste stream into raw materials and energy.  At WOIMA we combine Finnish engineering know-how in waste management with power generation design expertise. These solutions are used in Finland every day. They support the circular economy ideology and ensure that less than 1% of Finland’s waste ends up in landfills.

Our mission is to improve quality of life both locally and globally, as well as empower people to utilize waste as a commodity. Our decades of international project management experience ensure an on-time, in-budget and high-quality WOIMA solution delivery across the globe.

WOIMA SOCIAL MEDIA ACCOUNTS