Erection and installation of the WtE power plant equipment and materials, especially in remote locations, can be a time- and money-consuming exercise. These construction challenges have been addressed in the WOIMAdesign to ensure that the plant can be made available to anyone anywhere. Constructability is one of the key features of the flexible wasteWOIMA® WtE power plant.

The wasteWOIMA® WtE plant design reduces both the construction time and personnel during site works phase

  • The plant engineering and design is done with fast and cost-efficient on-site erection and installation work in mind
  • The plant is prefabricated into easily transportable modules in controlled workshop environment
  • With JOT deliveries the modules can be lifted directly onto their final location without the need for a lay-down area
  • Work on-site consists of erecting and joining (welding and/or bolting) the pre-fitted modules together

The modular plant structure generates on-site savings through

  • Fewer lifts
  • Less joining work
  • Less fitting work
  • Simple construction tools

Combined, these WOIMAbenefits can save over 1,000,000€ in plant erection and installation work, and speed up the phase by several months.

Follow the “Monetizing wasteWOIMA® Benefits” blog series to discover how our solution can save money for You.

WASTE-TO-ENERGY SOLUTION

WOIMA Corporation small logo web

Read more about us at www.woimacorporation.com

WOIMA Corporation is a Finnish supplier of best-in-class waste-to-value products, projects and services worldwide. We have developed solutions that enable us, and the customer, to transform and recycle virtually any waste stream into raw materials and energy.  At WOIMA we combine Finnish engineering know-how in waste management with power generation design expertise. These solutions are used in Finland every day. They support the circular economy ideology and ensure that less than 1% of Finland’s waste ends up in landfills.

Our mission is to improve quality of life both locally and globally, as well as empower people to utilize waste as a commodity. Our decades of international project management experience ensure an on-time, in-budget and high-quality WOIMA solution delivery across the globe.

WOIMA SOCIAL MEDIA ACCOUNTS