The wasteWOIMA® is designed for a 30-year lifespan in the harshest of conditions and with difficult waste fuels. This guarantees
Easy operability
Low-cost replacement parts
Long interval between maintenance breaks
Simple and fast maintenance processes
The combined one-time savings of the wasteWOIMA® plant during the project development and construction phases amount up to 7,000,000 €. The savings potential is naturally project-, site- and customer-specific and it is possible that not all savings are applicable to each individual project.
The savings are mainly a result of
Existing plant design, supply chain and documentation
Simpler, easier and faster work p...
Uncertainty is one thing all projects have in common. Much of this is caused by design and cost calculation challenges in one-off projects. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly. Since the design is standardized, so are...
Project Financing Savings
Project financing costs are significantly impacted by the length of the project development and delivery phases. Whether the phases are financed by equity or debt, there is always an associated cost; either direct through interest payments or indirect through opportunity costs.
Project financing costs are also dependent on perceived project risk level and the profitability / feasibility of said project.
WOIMA pro...
Uncertainty is one thing all projects have in common. Much of this is caused by design and cost calculation challenges in one-off projects. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly. Since the design is standardized, so are all the material lists.
Companies manage this uncertainty b...
Quality-based Risk Contingency Reduction
Uncertainty is one thing all projects have in common. Much of this is caused by the unknown circumstances of on-site work. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly.
Companies manage this uncertainty by including contingencies in their proj...
Localization Savings
The wasteWOIMA® WtE plant design & engineering already includes the potential for localizing the procurement and/or manufacturing of certain parts of the plant. Localization will typically enhance the acceptability of the delivery amongst local population and businesses as well as improve project profitability and feasibility.
Localization will also enable easier delivery of wasteWOIMA® WtE p...
Just-On-Time (JOT) Operational Savings
Due to the modular nature of the wasteWOIMA® WtE plant, it is much easier to plant the deliveries according to JOT (Just-On-Time) principle. The modules can be l...
Project Insurance Savings
Insurance is a practically mandatary part of any project transferring some or all of the risks associated with the project delivery to the insurance company. Insurance is often required also by investors wanting to make sure that the project is carried out on time and in budget regardless of any risk realization.
Insurances protect against e.g.
Engineering liabilities
Documentation Savings
Accurate and up-to-date final documentation plays a key role in ensuring profitable power plant operations and cost-efficient maintenance work. The already existing and time-tested wasteWOIMA® WtE plant documentation package ensures high data precision of the standardized plant with project-specific modifications.
No documentation package is static as the plant will continue to evolve throughout its life-span thro...