The WOIMAdesign caters for the needs of different types of customers when it comes to the number of personnel required to run the wasteWOIMA® WtE plant. Typically, customers in developed countries emphasize the use of more automation due to the high cost of personnel, while projects in emerging countries concentrate on employing more people.
There are several points, where automation can save significant personnel resources and improve op...
The wasteWOIMA® WtE plant is based on a standardized WOIMAdesign which is used for all current and future WOIMA customers.
Any improvements to the WOIMAdesign will automatically improve the competitiveness of all future plant deliveries through
Shorter overall project delivery time
Better-performing plant equipment
More cost-efficient logistics
Faster construction, erecti...
WOIMAdesign incorporates the fact that each WtE plant will require a major overhaul either during its design lifespan or to prolong the originally intended lifespan.
The modular structure of the wasteWOIMA® plant will facilitate simple and fast replacement of worn-out modules during corrective maintenance or prevent unexpected plant unavailability with preventive maintenance.
The replacement modules are also built in similar controlled worksho...
Prefabrication of the wasteWOIMA® plant modules means less on-site building, erection, and installation work in potentially challenging conditions.
The wasteWOIMA® plant modules are built in a controlled workshop environment, which leads to
High quality
Easy manufacturing scheduling
Reliable cost management
Prefabrication of the wasteWOIMA® plant modules means less on-site building, erection, and installation work in potentially challenging conditions.
The wasteWOIMA® plant modules are built in a controlled workshop environment, which leads to
High quality
Easy manufacturing scheduling
Reliable cost management
The warranty cost savings are generated through
The wasteWOIMA® is designed for a 30-year lifespan in the harshest of conditions and with difficult waste fuels. This guarantees
Easy operability
Low-cost replacement parts
Long interval between maintenance breaks
Simple and fast maintenance processes
The combined one-time savings of the wasteWOIMA® plant during the project development and construction phases amount up to 7,000,000 €. The savings potential is naturally project-, site- and customer-specific and it is possible that not all savings are applicable to each individual project.
The savings are mainly a result of
Existing plant design, supply chain and documentation
Simpler, easier and faster work p...
Uncertainty is one thing all projects have in common. Much of this is caused by design and cost calculation challenges in one-off projects. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly. Since the design is standardized, so are...
Project Financing Savings
Project financing costs are significantly impacted by the length of the project development and delivery phases. Whether the phases are financed by equity or debt, there is always an associated cost; either direct through interest payments or indirect through opportunity costs.
Project financing costs are also dependent on perceived project risk level and the profitability / feasibility of said project.
WOIMA pro...
Uncertainty is one thing all projects have in common. Much of this is caused by design and cost calculation challenges in one-off projects. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly. Since the design is standardized, so are all the material lists.
Companies manage this uncertainty b...