Project Financing Savings
Project financing costs are significantly impacted by the length of the project development and delivery phases. Whether the phases are financed by equity or debt, there is always an associated cost; either direct through interest payments or indirect through opportunity costs.
Project financing costs are also dependent on perceived project risk level and the profitability / feasibility of said project.
WOIMA pro...
Uncertainty is one thing all projects have in common. Much of this is caused by design and cost calculation challenges in one-off projects. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly. Since the design is standardized, so are all the material lists.
Companies manage this uncertainty b...
Quality-based Risk Contingency Reduction
Uncertainty is one thing all projects have in common. Much of this is caused by the unknown circumstances of on-site work. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly.
Companies manage this uncertainty by including contingencies in their proj...
Localization Savings
The wasteWOIMA® WtE plant design & engineering already includes the potential for localizing the procurement and/or manufacturing of certain parts of the plant. Localization will typically enhance the acceptability of the delivery amongst local population and businesses as well as improve project profitability and feasibility.
Localization will also enable easier delivery of wasteWOIMA® WtE p...
Just-On-Time (JOT) Operational Savings
Due to the modular nature of the wasteWOIMA® WtE plant, it is much easier to plant the deliveries according to JOT (Just-On-Time) principle. The modules can be l...
Project Insurance Savings
Insurance is a practically mandatary part of any project transferring some or all of the risks associated with the project delivery to the insurance company. Insurance is often required also by investors wanting to make sure that the project is carried out on time and in budget regardless of any risk realization.
Insurances protect against e.g.
Engineering liabilities
Documentation Savings
Accurate and up-to-date final documentation plays a key role in ensuring profitable power plant operations and cost-efficient maintenance work. The already existing and time-tested wasteWOIMA® WtE plant documentation package ensures high data precision of the standardized plant with project-specific modifications.
No documentation package is static as the plant will continue to evolve throughout its life-span thro...
Simple and fast on-site commissioning and trial run phase is one of the key factors enabling the delivery of the wasteWOIMA® WtE plant practically anywhere in the world. The plant modules have already been pre-commissioned at the workshop and similar to all other plant delivery phases, the commissioning workflow has been optimized for speedy service.
Erection and installation of the WtE power plant equipment and materials, especially in remote locations, can be a time- and money-consuming exercise. These construction challenges have been addressed in the WOIMAdesign to ensure that the plant can be made available to anyone anywhere. Constructability is one of the key features of the flexible wasteWOIMA® WtE power plant.
Monetizing wasteWOIMA® Benefits - Modular Service Buildings Design & Build Phase
The wasteWOIMA® WtE power...