Monetizing wasteWOIMA® Benefits – On-site Welding Phase

The “soul” of the WtE power plant is the gas-tight boiler where hot flue gases transfer their energy into the steam-water cycle. Traditional stick-built power plants require a large amount of welding on-site, up to 30,000 welding joints, often in challenging conditions, to create the gas-tight boiler structure. While, the wasteWOIMA® plant requires less than 1,000 welding joints. The rest are done in a controlled workshop environment prior to delivering the modul...
Read more

Integrated Approach to Minimizing Pollution 

EU’s Industrial Emission Directive  The Industrial Emissions Directive (IED) of the European Union (EU), adopted in 2010, is a critical regulation aimed at minimizing pollution from industrial activities across Europe. It ...
Read more

Latest articles