Monetizing wasteWOIMA® Benefits – Wastewater Treatment Savings

A waste-to-energy power plant can be a significant source of wastewater, if not designed properly. The wasteWOIMA® WtE plant is a dry plant that only uses dry or semi-dry systems and produces no wastewater. The plant does use water in cooling the bottom ash in the slag pool beneath the grate and in the flue gas treatment (FGT) system, but this water evaporates prior to becoming wastewater. The wastewater treatment savings in the wasteWOIM...
Read more

Monetizing wasteWOIMA® Benefits – Water Consumption Savings

Water is an extremely precious, and often scarce or hard-to-reach, resource in many parts of the world. The WOIMAdesign ensures that as little water as possible is wasted in the wasteWOIMA® WtE plant mainly thanks to the closed steam-water –cycle. Unfortunately, it is still inevitable that some water (~500-600 l/h) is required to replenish the plant due to evaporation and water quality degradation. All the water in the wasteWOI...
Read more

Monetizing wasteWOIMA® Benefits – Automation-based Personnel Savings

The WOIMAdesign caters for the needs of different types of customers when it comes to the number of personnel required to run the wasteWOIMA® WtE plant. Typically, customers in developed countries emphasize the use of more automation due to the high cost of personnel, while projects in emerging countries concentrate on employing more people. There are several points, where automation can save significant personnel resources and improve op...
Read more

Monetizing wasteWOIMA® Benefits – Know-how Accumulation Savings

The wasteWOIMA® WtE plant is based on a standardized WOIMAdesign which is used for all current and future WOIMA customers. Any improvements to the WOIMAdesign will automatically improve the competitiveness of all future plant deliveries through Shorter overall project delivery time Better-performing plant equipment More cost-efficient logistics Faster construction, erecti...
Read more

Monetizing wasteWOIMA® Benefits – Major Overhaul Savings

WOIMAdesign incorporates the fact that each WtE plant will require a major overhaul either during its design lifespan or to prolong the originally intended lifespan. The modular structure of the wasteWOIMA® plant will facilitate simple and fast replacement of worn-out modules during corrective maintenance or prevent unexpected plant unavailability with preventive maintenance. The replacement modules are also built in similar controlled worksho...
Read more

Monetizing wasteWOIMA® Benefits – Maintenance Cost Savings

Prefabrication of the wasteWOIMA® plant modules means less on-site building, erection, and installation work in potentially challenging conditions. The wasteWOIMA® plant modules are built in a controlled workshop environment, which leads to High quality Easy manufacturing scheduling Reliable cost management
Read more

Monetizing wasteWOIMA® Benefits – Warranty Cost Savings

Prefabrication of the wasteWOIMA® plant modules means less on-site building, erection, and installation work in potentially challenging conditions. The wasteWOIMA® plant modules are built in a controlled workshop environment, which leads to High quality Easy manufacturing scheduling Reliable cost management The warranty cost savings are generated through
Read more

Monetizing wasteWOIMA® Benefits – Summary of One-time Project Savings

The combined one-time savings of the wasteWOIMA® plant during the project development and construction phases amount up to 7,000,000 €. The savings potential is naturally project-, site- and customer-specific and it is possible that not all savings are applicable to each individual project. The savings are mainly a result of Existing plant design, supply chain and documentation Simpler, easier and faster work p...
Read more

Monetizing wasteWOIMA® Benefits – Cost-based Risk Contingency Reduction

Uncertainty is one thing all projects have in common. Much of this is caused by design and cost calculation challenges in one-off projects. The pre-engineered and prefabricated wasteWOIMA® WtE plant is built in high-quality workshop conditions into modules that are fast and cost-efficient to assemble on site reducing the project risk significantly. Since the design is standardized, so are...
Read more

Latest articles